Introduction

This article guides you how to edit the existing standard report based on Kibana dashboard.


Pre-requisites


Step-by-Step Instruction


1. To edit the scheduled report, select “Edit” from the “Action” drop-down in the Skedler home page.



2. Edit the report with the required changes, for example, you can edit the report by including excel report, changing the schedule frequency time and adding merge parameters to the email message. Click the Save and Exit option from the “Action” drop-down, to update filter details of the schedule report


Next Steps